An integral part of the structure are concrete flanges installed at the river banks at the extremities of a unite. In some cases, depending on the width of the river, intermediate flanges are placed in accordance with the width of the turbines to be installed. Hydraulic lifts are installed on the upper part of each flange that supporting the weight of one to three turbines in their operating position or when necessary
The technology is based on a new conception of a turbine to generate electric energy employing hydro resources in its natural form thereby permitting the conservation of the natural flow of a river as well as the river bed and its banks which preserves the eco system.
The installation of highly sensitive sensors and cameras provide for the remote control and operation of a unit via the internet. This permits adjusting the position of the turbines according to river conditions.
Click here for a more detailed description of the operation of a unit




